Privacy and cookies

We use cookies to improve the user experience when you visit our website. Cookies are also used for analyzing traffic on this website. This information cannot be traced back to you as an individual. You can change the settings in your browser yourself so that cookies are not accepted. Deactivating cookies may result in the website not working optimally.

Read More

History and Assumptions

Historisk foto som viser verdens største vannelektrolyse-anlegg for produksjon av hydrogen i Glomfjord.

  • Historical hydrogen production in the industrial park
  • Hydrogen was produced here for over 40 years, from 1949 to 1993
  • Very advantageous location in Glomfjord Industripark provides a low hydrogen price
  • Stable and safe access to affordable power (NO4)
  • Lowest net rent in the region
  • Established infrastructure provides low operating costs.
  • The project is technically very mature.

Technical status

  • Access to power is ensured
  • Letter of intent with Yara regarding the sale of oxygen
  • The area has been fully regulated
  • The project has come a long way in detailed planning.
  • Good access to services, which ensures regularity and low operating costs
  • Low net rent in Yara's industrial concession
  • NEL as a supplier of a turnkey hydrogen production plant
  • Leading technology companies as partners in the entire value chain
  • Long term solid owners

Briefly explained: The project is very well equipped technically for construction and start-up.

Prerequisites

  • Glomfjord Hydrogen has received a financial commitment of 150 MNOK in investment support from Enova to establish production of hydrogen
  • Hydrogen gas, 8 tonnes/day. Investment: 350 MNOK. Start-up: May 2025

 

Kontakt oss

Her kan du legge inn en tekst som vises på alle sider der du har aktivert høyrekolonne og kontaktboks. Innhold i denne boksen redigerer du i publiseringssystemet under Moduler > Høyrekolonne kontaktboks.

Accessibility and webdesignby Digitalt Byrå